Thursday, March 13, 2014

Update on CINEMILLS Studio Construction

Since we last posted from our previous blog, 'Introduction CINEMILLS Digital Studio,' we had since done a lot of work in our studio. Thanks to our fantastic vendors for working with us on deadlines and specific projects. Every weekday and weekends our staff and construction crews working hard to get closer to the finish line.

Here are updates from the last few months starting with the latest.
Installing cables.
Getting the pipes, tracks, lights, and cables to be rigged.
We painted the ceiling black to keep unwanted light reflection.

Replacing the front entrance with new windows and frame.

The Private Room being finished and adding nice accents on the wall.
They crew working on the green screen cove. This design makes it easier to key out in post and a parabolic degree to reduce echo of sound.

22 foot wall just went up. This will sound proof the front entrance and rooms of the studio.
22 foot wall just went up. This will sound proof the front entrance and rooms of the studio.
Installing the new air-conditioning system.
Cutting the old bolts, surfacing the floor for sealant.
Digging up trenches to make room for the plumbing.
Our crew assessing the location, back in August, 2013.
   

1 comment:

  1. Excellent. I can't wait to see this complex up and running! You can never have enough studios, with the ever expanding productions of films. Hope it gets the right kind of air conditioning, and that it will not muddle the acoustics. That would really benefit the people using the space, and will attract more clients in the future.