Here are updates from the last few months starting with the latest.
![]() |
| Installing cables. |
![]() |
| Getting the pipes, tracks, lights, and cables to be rigged. |
![]() |
| We painted the ceiling black to keep unwanted light reflection. |
![]() |
| Replacing the front entrance with new windows and frame. |
![]() |
| The Private Room being finished and adding nice accents on the wall. |
![]() |
| They crew working on the green screen cove. This design makes it easier to key out in post and a parabolic degree to reduce echo of sound. |
![]() |
| 22 foot wall just went up. This will sound proof the front entrance and rooms of the studio. |
![]() |
| 22 foot wall just went up. This will sound proof the front entrance and rooms of the studio. |
![]() |
| Installing the new air-conditioning system. |
![]() |
| Cutting the old bolts, surfacing the floor for sealant. |
![]() |
| Digging up trenches to make room for the plumbing. |
![]() |
| Our crew assessing the location, back in August, 2013. |
















